Skip to content
Integrity 1st Development Partners — homeIntegrity 1st
Development Partners
Integrity 1st Car Pros

INTEGRITY 1ST DEVELOPMENT PARTNERS

Real estate built around
the business it serves.

Integrity 1st Development Partners is the development group formed out of the growth of Integrity 1st Car Pros — the site selection, land, municipal approvals and construction oversight behind its facilities. Three ground-up projects in North Texas are published here. We are not the architect, the engineer of record or the general contractor.

The Anna, Texas facility in September 2026: the building wrapped in green sheathing, a row of open service-bay openings along its right-hand side, construction equipment working at the base and the poured parking lot in the foreground.
Anna, TX Sheathed, bays open · 16 September 2026

02 Origin

We didn’t start as developers.
We became developers because
we are operators.

Integrity 1st Development Partners grew out of the expansion of Integrity 1st Car Pros. As the business entered new markets, we saw what happens when site selection, real estate, architecture, construction and operations are treated as separate decisions.

They aren’t.

The property has to work operationally. The layout has to support the team. The building has to support the customer experience. The investment has to make sense long after construction ends.

IDP brings those decisions together from the beginning.

03 Portfolio

Development in motion

Two in construction. One in development. None complete.

Ground-up Integrity 1st Car Pros facilities in North Texas — Anna, Wylie and Aubrey, each at a different stage. One is a franchise-owned location. Project pages state what is documented for each, including the partner firms credited on them.

  1. The Anna, Texas facility under construction in September 2026, wrapped in green sheathing with its service bays open and the parking lot poured. Ground-Up Development Under Construction Sheathed, bays open ANNA Anna, Texas 609 Victoria Falls Dr
    Anna, TX 75409
    A ground-up Integrity 1st Car Pros facility on Victoria Falls Drive. The structure is sheathed, the service bays are open and the parking lot is poured. Photographed across eight site visits from February 2026. Explore project
  2. Aerial view of the poured concrete slab at the Wylie, Texas site, with excavators and a haul truck at its edge. Ground-Up Development Under Construction Slab poured, utilities open WYLIE Wylie, Texas 990 S State Hwy 78
    Wylie, TX 75098
    A franchise-owned Integrity 1st Car Pros location on State Highway 78. Groundbreaking was 8 August 2026, with the building slab already poured and site utilities open. Dallas Commercial Builders is credited in the groundbreaking film. Explore project
  3. AUBREY TX · GROUND-UP DEVELOPMENT SITE PHOTOGRAPHY PENDING Ground-Up Development Pre-Development AUBREY Aubrey, Texas 3926 Frontier Parkway
    Aubrey, TX 76227
    An address in the pipeline. Construction has not started and there is no site photography yet. Explore project

04 The operator advantage

We look at buildings differently
because we have to operate them.

Traditional development can end when construction is complete. For us, that is when the real test begins.

A facility has to move vehicles efficiently. Service bays have to support production. Customers need to understand where to go. Employees need an environment designed around their work. Entrances, parking, traffic flow and signage have to function outside the site plan.

Those are operating questions before they are design questions, and they are the ones this group brings to a site.

Aerial view of the Wylie development site during construction. State Highway 78 runs down the right-hand edge; the poured building slab sits at the centre of the parcel with open utility trenching around it; the graded vehicle approach lies between the slab and the highway; and open ground for the service side and future expansion runs along the left.

Wylie, Texas, 8 August 2026. The building slab was poured and the site utilities were open. The finished building along the highway is on the neighbouring parcel, not this project.

05 Approach

Acquire.
Reposition.
Develop.

Three pathways to the same outcome: a property that works for the business that has to operate inside it. Which one applies is a function of what the market already has.

  1. Acquire

    When the right existing automotive property or operating business is available, acquisition can provide a faster path to market while preserving valuable infrastructure and real estate.

  2. Reposition

    Existing properties can be expanded, modernised, converted or redeveloped around the needs of the operating business.

  3. Develop

    When the right facility does not exist, we develop it from the ground up — coordinating site planning, design, engineering, municipal requirements, construction and operating needs around the future business.

06 Capabilities

What this group does

  • Market & site evaluation

    Market growth, demographics, access, visibility, site configuration, the competitive environment, intended use and the operational requirements the property will have to meet.

  • Acquisition & due diligence

    Coordination with brokers, property owners, advisors, internal stakeholders and the relevant outside professionals through diligence and closing.

  • Entitlements & municipal coordination

    Use, zoning, parking, access, site planning, signage and the municipal requirements that shape what a property can become.

  • Design & engineering coordination

    Working alongside architects and engineers so the design functions both as a building and as an operating business.

  • Construction & project oversight

    We work with architects, engineers, general contractors and specialty trades to keep the development aligned with the project objectives through construction.

  • Redevelopment & property improvement

    Building modernisation, expansion, exterior and customer-area improvements, additional service capacity, traffic-flow changes and facility upgrades.

07 Process

From land to operations

Follow the process, not just the finished building.

  1. 01

    Site & Market

    Property evaluation, market analysis, due diligence and site planning.

  2. 02

    Design

    Architecture, engineering, municipal coordination and operational layout.

  3. 03

    Groundbreaking

    Mobilisation, site work and the beginning of construction.

  4. 04

    Construction

    Structure, exterior, utilities, service areas and customer spaces take shape.

  5. 05

    Build-Out

    Finishes, signage, equipment, technology and operating infrastructure.

  6. 06

    Opening

    The developed property becomes an operating business.

08 Design standard

Built to a standard.
Designed for the site.

As Integrity grows, IDP is developing repeatable design and construction standards that create consistency without treating every property as identical.

A standard carries what should not be re-litigated on every project: brand consistency, the customer experience, service capacity, the relationships between spaces that make a facility work. The site carries everything else — its constraints, its access, its orientation, its local requirements.

Repeatable does not mean identical.

The Anna facility in September 2026 seen head on, with a row of open service-bay openings running the length of the building.
Anna, Texas — the service-bay elevation sheathed, September 2026.

09 Partners & opportunities

Have a property or
development opportunity?

If you have a North Texas site that could carry an Integrity 1st Car Pros facility, send it over. The form asks for the property first; only the address, a name and an email are required.

What we are looking for

A North Texas site for an Integrity 1st Car Pros facility — a development parcel, or an existing automotive property.

Send the address and a listing link. Everything else on the form is optional.

Submit a property

The property
You

Have a brochure or offering memorandum? Send the link above, or attach it to your reply once we are in touch.